Bloom Lake (QIO) – 16 MTPA Expansion Project – Feasibility Study

Bloom Lake (QIO) – 16 MTPA Expansion Project – Feasibility Study

QIO (Quebec Iron Ore – Champion Iron) appointed SYSTRA Canada to conduct a feasibility study.

This study aims to identify the infrastructure and operational changes required to double the capacity of the 457-km Bloom Lake to Pointe-Noire (Sept-Îles terminal) railway in Quebec, Canada. The goal was to reach a target of 16 MTPA in a multi-operator and multi-user context.

DESCRIPTION

During a previous phase, SYSTRA Canada’s study had included the following key components:

  • Rail line capacity assessment (operation simulations);
  • Identification and conceptual design of the required infrastructure packages;
  • Operational Assessment Report;
  • Implementation Strategy Report;
  • CAPEX/OPEX estimate for all considered options;
  • Cost/benefit analysis.

During the feasibility phase, SYSTRA Canada reached a level of project definition compliant with a Class 3 estimate (preliminary engineering) in a very challenging timeframe.

Top of the page
SYSTRA Canada 1100, boul. René-Lévesque Ouest, 10e étage, Montréal (Québec) CANADA H3B 4N4 | +1 514-985-0930
Contact