Detailed Engineering of AST2 Rail Yard for Industrial Chemical Plant in Corunna, Ontario

Detailed Engineering of AST2 Rail Yard for Industrial Chemical Plant in Corunna, Ontario

Technicas Reunidas Canada hired SYSTRA Canada to perform a detailed engineering study for a future rail yard for a chemical plant in Corunna, Ontario, Canada.

The mandate consisted of:

  • Rail Yard Substructure Engineering (to top of sub-ballast), including grading, access roads, ditches and drainage of access roads;
  • Rail Yard Superstructure Engineering (from ballast to top of rail).

DESCRIPTION

SYSTRA Canada’s mandate included:

  • Trackwork Design: Conceptual rail geometry and verification of design criteria; Detailed track geometry, including switches, crossings, and turnouts; General track configuration (rail profile, sleepers); Interface design to existing railway; Estimation of quantities.
  • Operational Requirements: Validation of loading/unloading rail barn layout; Validation of rail car wash barn layout; Interface design with rail car wash barn; Interface design with railcar loading/unloading.
  • Drainage Design: Sub-grade and sub-ballast drainage and connection to general ditch arrangement; Open ditch geometry and alignment for internal roads and rail yard groups; Interface with general drainage design of the AST2 project.
  • Interface Design Management: Verification of interface subsystems; Sub-grade, ballast and sub-ballast study; Identification of necessary removals; Material specifications for construction; Structural design to support infrastructure.
  • Safety Case Analysis: Analysis of temperature effects in rail tracks; Analysis of potential train derailment cases; Rail fastening system specifications (to support above).