Feasibitily Study and Business Plan for VIA Rail’s High Frequency Rail Project

Feasibitily Study and Business Plan for VIA Rail’s High Frequency Rail Project

Feasibility study - Evaluation of technical solutions and proposal of a business plan for the construction of a high-frequency passenger railway between Ottawa-Toronto, and Quebec-Montreal.

The goal of the High Frequency Rail Project was to provide VIA with the capacity to increase train frequency and on-time performance with the construction of a track dedicated to passenger trains.

Furthermore, the objective was to evaluate the technical-economic feasibility of building new segments of track and rehabilitating existing track segments. SYSTRA Canada (formerly CANARAIL) oversaw the preparation of a Business Plan and performed a 30% level engineering design and a capital expense estimate at -15/+20% accuracy.

DESCRIPTION

The specific services provided by SYSTRA Canada were as follows:

  • Review of previous studies;
  • Evaluation of the ridership;
  • Assessment of technical-economic options;
  • Financial Modeling;
  • Risk assessment;
  • Preparation of a Business Plan;
  • Preliminary Environmental Impact Assessment to determine environmental and social considerations during construction;
  • Definition of Design Criteria;
  • Field Investigations and determination of upgrade requirements including:
    • Surveying services;
    • Geotechnical investigations;
    • Bridge & Culvert inspections;
    • Track inspections;
    • Level Crossing inspections;
    • Assessment of electric and diesel locomotive options;
  • Evaluation of optional electrification costs;
  • Preliminary CTC (Centralized Traffic Control) arrangement;
  • Evaluation of the impacts associated with Utilities;
  • Relocation of existing Multi-User trail;
  • Preliminary arrangement of Passenger Stations;
  • Alignment optimization;
  • Preparation of an operations plan;
  • Preparation of a Track Schematic;
  • Simulation of cycles times for the optimized route;
  • Evaluation of the use of Sidings vs Passing Tracks;
  • Re-optimization of the alignment to ease tight curves;
  • Evaluation of legal considerations and estimation of land acquisition;
  • Determination of cut and fill volumes required during the project;
  • Preparation of a drawing package including: plans, condensed profile, typical details, preliminary bridge design, earthworks, cross sections, etc.;
  • Preparation of Performance Specifications for the Design-Build process;
  • Evaluation of material type and minimum material requirements needed for the rail foundation as well as quantities for each rail component;
  • Preparation of a preliminary Bill of Quantities;
  • Development of Phasing, Construction planning and strategy;
  • Evaluation of Capital Expenses;
  • 20% level engineering Study of the Quebec-Montreal Corridor.
Top of the page

Read also

CBG/Boké Railway Capacity Expansion
CBG/Boké Railway Capacity Expansion
The core business of Compagnie de Bauxite de Guinée (CBG) is the mining and (...)
Design of Temporary Tracks at Ras Al Khair, KSA
Design of Temporary Tracks at Ras Al Khair, KSA
Implementation of a Public Transportation Network for Quebec City (Tramway Component)
Implementation of a Public Transportation Network for Quebec City (Tramway Component)
The Structuring Transit Netowrk (RSTC – Réseau structurant de transport en (...)
Rehabilitation of Entire Fleet of Wagons for CBG
Rehabilitation of Entire Fleet of Wagons for CBG
SYSTRA Canada (formerly CANARAIL) was mandated to carry out the (...)
Bloom Lake (QIO) – 16 MTPA Expansion Project – Feasibility Study
Bloom Lake (QIO) – 16 MTPA Expansion Project – Feasibility Study
QIO (Quebec Iron Ore – Champion Iron) appointed SYSTRA Canada to conduct a (...)
Boké Railway – Multi-User Expansion Project
Boké Railway – Multi-User Expansion Project
SYSTRA Canada (formerly CANARAIL) is responsible for performing the (...)
Feasibility Study for the Electrification of an STM Bus Garage
Feasibility Study for the Electrification of an STM Bus Garage
SYSTRA Canada has been mandated to accompany the STM in the development of (...)
Interoperability Study to Operate HFR VIA Trains on Montreal’s Réseau express métropolitain (REM)
Interoperability Study to Operate HFR VIA Trains on Montreal’s Réseau express métropolitain (REM)
VIA foresees the construction of a dedicated High Frequency Railway (HFR) (...)
Detailed Engineering of AST2 Rail Yard for Industrial Chemical Plant in Corunna, Ontario
Detailed Engineering of AST2 Rail Yard for Industrial Chemical Plant in Corunna, Ontario
Technicas Reunidas Canada hired SYSTRA Canada to perform a detailed (...)
Réseau express Métropolitain – Consulting Work Relative to Stray Currents and Harmonics
Réseau express Métropolitain – Consulting Work Relative to Stray Currents and Harmonics
The Réseau Express Métropolitain (REM) uses a 1,500 Vdc traction power system (...)
Consultancy Services for Development of Railway Infrastructure for GSEZ Mineral Port at Libreville
Consultancy Services for Development of Railway Infrastructure for GSEZ Mineral Port at Libreville
The Gabon Special Economic Zone (GSEZ) plans to increase the volume of iron (...)
Supervision of the Earthworks of the CFB and Construction of Structures
Supervision of the Earthworks of the CFB and Construction of Structures
Supervision of earthworks and access road, including the storage area, the (...)